Solar News

Eammar Solar main product:solar water heater,solar collector.

« India under the solar energy waiting for bloom "Fra pavel" solar repeatedly without card dealers bad management »

Meet built in solar power generation must degrees roof

In tribute to meet in his workshop wine is built on a 10 megawatts of, more than 10 football size of photovoltaic solar power, power more than 10 million degrees every year. Reporters yesterday from the provincial energy bureau that ministry of science and technology, ministry of finance and the state energy bureau recently released its 2012 first gold sun demonstration project, anhui province has eight project selected, included in the project meet gong wine.

Four or five years will pay cost

In anhui province in gold sun project list, most of the eight items are park,solar water heating technology development zone, science and technology industrial park etc, which in gong wine and meet the embellish photovoltaic is the enterprise self building, and drive is to meet and photovoltaic not only enterprise of the coasts.

According to information, in tribute to meet wine (pv) power project built by the state of operation review the installed capacity is 10 megawatts (mw). This 10 megawatts of power station built? Built on the roof, a project to tell a reporter, 10 megawatts of power station need about 8 square meters of the roof, and this is equivalent to more than 10 football area.

So, in tribute to meet in photovoltaic power station wine roof jacket, power generation for my own use economical? According to information, at present, the investment photovoltaic power station is about 1.1 yuan/tile, 10 megawatts of total investment of 110 million yuan, gold sun engineering will the government subsidies 0.55 yuan/tile,solar system enterprise fixed investment of 55 million yuan. After measuring,compact solar water heater 10 megawatts of power station in a year of generating capacity in huoshan is about 10.8 million degrees, according to the price of industrial enterprises, meet four or five years in gong wine will pay cost. And the life of photovoltaic power station is about 25 years.

Equal to the roof plant 500000 trees

In addition to economic benefit, countries more consideration is from energy conservation and emission reduction. And simple according to a tree, a year may absorb carbon dioxide 20 kg calculation,solar geyser meet the power station is kind of in the 500000 trees.

In gong wine (pv) power to meet project to use fixed number of year is 25 years, on the ecological contribution was great, its 25 years accumulative total can reduce carbon dioxide emissions of about 268750 tons, solar heating10787 tons of sulfur dioxide and nitrogen oxides more than 600 tons. Also, for enterprise that, carbon trading now the price is about 83 yuan per ton, and brings to the enterprise extra economic benefits.

Since 2009 the national implementation of golden sun since demonstration project, in our province, there were 10 on total application demonstration projects and 13 scattered construction demonstration projects shortlisted directory, involving 11 cities, seven development zone (including four national development),solar hot water heater the total installed capacity to 170 megawatts (mw) and project completed all will get about $1.1 billion the central financial support, close to 200 million kilowatt hours of electricity generating capacity, the alternative BiaoMei about 60000 tons.

 

Post comment:

◎welcome to give out your point。

Calendar

Comments

Previous

Zhejiang Eammar Solar Energy Co.,Ltd. professionally manufactures solar water heater,solar collector.